For immersive training providers, simulation teams & systems integrators
What does it take to turn a written procedure into an interactive training scenario?
Start from what you already have: a job hazard analysis, a permit form, the content of an existing SCORM module, or a building model in IFC or Revit. Ziva builds the scenario with an AI agent inside the engine and hands back an editable Unreal Engine, Unity, or Godot project. Your specialists approve the procedure.
Start from whatever you already have
Most projects start from one or two of these. None of them is required. Send what you have and the review identifies what is missing.
- A job hazard analysis. OSHA publication 3071 describes the method and OSHA publishes a blank worksheet. OSHA 3071 (PDF) OSHA JHA worksheet (PDF)
- A permit form, such as the sample confined space entry permit in Appendix D to 29 CFR 1910.146. 29 CFR 1910.146 Appendix D
- The content of an existing SCORM module, slide deck, or video script.
- A building model in IFC or Revit, or a floor plan and photos of the site. For Unreal Engine projects, Epic lists both formats among the files Datasmith imports. Epic Games documentation
What you get back
- An editable project in your engine: scenes, scripts, and assets, handed over as source.
- The hazards and decisions in the scenario mapped to the steps of your procedure.
- The assessment events your buyer specified in the scope.
- A handoff note so your team can update sites, equipment, and procedures later.
Ziva for Godot 4.2 and later is available to download today. Unity is in beta. Unreal Engine and Isaac Sim begin with a scoped enterprise pilot.
How the work is priced
Enterprise pricing is custom to your organization, engine, and use case. There is no public price list. Send what you have through the project inquiry and the quote follows that review. Support and commercial terms are written into the engagement.
Market context
Third-party figures, each linked to its source.
| Item | Figure | Source |
|---|---|---|
| VR training pilot, 1 to 2 modules | $50,000 to $100,000 | Frame Sixty |
| Standard custom VR training, multiple modules with LMS integration | $100,000 to $200,000 | Frame Sixty, citing VR Vision Group |
| Advanced VR training with AI scenarios, haptics, or multiple environments | $200,000 to $500,000 and up | Frame Sixty |
| Share of build hours spent on 3D asset production | 50 to 70 percent | Frame Sixty |
| Cost of a follow-on module relative to the first | 40 to 60 percent of the first module | Frame Sixty, citing VR Vision Group |
| Custom VR program, from a single module to a multi-scenario program | $25,000 to $500,000 or more | Reality Atlas |
| Custom eLearning by interactivity level, Level 1 to Level 3, from development ratios at the guide's $100 per hour blended rate | $4,000 to $40,000 or more per finished hour | Check-n-Click |
| Lead time for a custom-scenario VR build | 6 to 10 weeks per scenario | Ludus |
| Item | Figure | Source |
|---|---|---|
| HAZWOPER refresher, 29 CFR 1910.120(e)(8) | Eight hours of refresher training annually | osha.gov |
| Permit-required confined spaces, 29 CFR 1910.146(g)(2) | Training before first assignment, before a change in duties, when a new hazard appears, and when deviations or knowledge gaps are found | osha.gov |
| Mine refresher training, 30 CFR 46.8 | No less than 8 hours, no later than 12 months after the previous refresher | ecfr.gov |
| Airport movement and safety areas, 14 CFR 139.303(c) | Before initial duties and at least once every 12 consecutive calendar months | ecfr.gov |
| Powered industrial truck operators, 29 CFR 1910.178(l)(4)(iii) | Performance evaluation at least once every three years | osha.gov |
| Lockout/tagout, 29 CFR 1910.147(c)(6)(i) | Inspection of the energy control procedure at least annually | osha.gov |
| Electric power work practices, 29 CFR 1910.269(a)(2)(iv) | Inspections at least annually that employees follow the work practices | osha.gov |
| Emergency action plan, 29 CFR 1910.38(f) | Review when the plan is developed, on first assignment, when responsibilities change, and when the plan changes; no fixed interval | osha.gov |
| UK construction sites, CDM 2015 | Site-specific induction for every worker; the principal contractor must ensure it is provided | hse.gov.uk |
Who this is for
- Founders, CEOs, and managing directors of immersive and serious-games studios
- Creative directors, production directors, and heads of delivery
- CTOs and technical directors who approve a new engine or pipeline
- Heads of learning design, chief learning officers, and directors of learning experience
- Business development leads and RFP inboxes at custom eLearning agencies
- HSSE learning managers and regional HSSE managers
- Training and training-innovation managers, learning technology directors, and learning program managers
- Heads of training at ground handlers and airport operations supervisors
- HSE managers, safety directors, and directors of loss control at insurers
Questions to resolve before production.
What if we do not have a job hazard analysis or a building model?
Can we use our own procedures and customer assets?
Can the module support VR, desktop, offline delivery, or an LMS?
Which engine will the project be in?
Does an interactive scenario certify compliance?
Who owns the project after handoff?
Review the interaction before approving the training approach.
This warehouse example demonstrates hazard identification, prompts, feedback, and scoring. It does not certify procedure accuracy or regulatory compliance; qualified reviewers must approve both for a real deployment.